Date: 2026-07-25. Status: PINNED / inputs only. No requirements have been drafted. This file exists so the work resumes without re-derivation.
STATUS: PINNED, not started. The operator ruled 2026-07-25: "Hold the SpryGit document creation until after we finish up the Code handover but make sure it is pinned so we can continue it shortly." This handoff pack IS the Code handover, so SpryGit is the next Chat deliverable.
A DEV HANDOVER DOCUMENT for the in-house SpryGit team: a full feature list covering basic functions, advanced functions, protocols, API surface, and other requirements, scoped so the product has everything needed for proper integration into this stack and the processes being developed here.
The operating model pinned in item 70 has a REAL DEPENDENCY on git-host capability that GitBucket does not meet. SpryGit's requirements are therefore not speculative -- they are derived from a concrete pipeline this project is about to build. Known inputs already identified:
Current products in use, project knowledge, and online research into other git products' feature sets.
No requirements have been drafted. Nothing in this file is a requirement list -- it is the pin plus the inputs already known, so the work resumes without re-derivation.