Plane IPAM complete on the new region: 24/0 PASS, existing tooling only
dc-plane-ipam.sh check vr1-dc0 goes from pass 7 / fail 17 to pass 24 / fail 0, exit 0. Two idempotent applies, dry-run first, every write read back: 13 D-134 reserved bands plus the FIP pool, then the 5 missing v6 plane subnets each created on the same MAAS vlan as its v4 twin. No new code was needed. The tool's forced sequencing also proved itself -- the reserve run skipped every v6 band with 'not in MAAS yet, run carve-v6 first' rather than failing or silently no-opping, so running the two out of order is safe. This is the step that justifies the tunnel architecture: carve-v6 derives its prefixes from the NetBox apex, reachable only from voffice1, while the target region is reachable only via the rack. Neither host alone could have run it. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01HvCyrwvYTTcDYnRErfMsNf |
|---|
|
|
| docs/CURRENT-STATE.md |
|---|
| docs/audit/dc0-region-plane-ipam-20260730.txt 0 → 100644 |
|---|
| docs/changelog-20260730-dc0-region-migration.md |
|---|