Stage-5 dc1: committee review + Fork-1 ruling (D-104 amendment) + BUNDLEFIX-052
Track-2 bundle-render blocker, committee-adjudicated (4 read-only lenses:
Roosevelt-delta / HA-DR / operational-risk / Juju-MAAS-mechanism). Every
load-bearing claim re-verified against the repo before adoption.

- Committee record: docs/audit/committee-20260724-track2-bundle-render.md
- Fork 1 RULED (operator, GA-R5): dedicated 10th per-DC controller VM ->
  D-104 amendment. Capacity gate PASS (measured): 10-node x 2-DC =
  854/1024 GiB (83%, FIT, 170 GiB headroom);
  docs/audit/stage5-controller-capacity-20260724.txt
- BUNDLEFIX-052: removed an orphaned `bindings:` block absorbed into
  ceph-rbd-mirror (clobbered its D-108 replication bindings + injected a
  phantom `dashboard` endpoint -> juju deploy reject). provider-bundle-check PASS.
- CURRENT-STATE Stage-4 bullet updated same change set (GA-R1/C1).

No cloud state mutated. Fork 2/3 = OPS committee-unanimous, executed under gating.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VUjEb7onHpdqFHUnio6iVw
1 parent 1b80a56 commit 72cad5fa3b337ab674db29f54ed025f7a024403d
@JANeumatrix JANeumatrix authored 22 hours ago
Showing 6 changed files
View
bundle.yaml
View
docs/CURRENT-STATE.md
View
docs/audit/committee-20260724-track2-bundle-render.md 0 → 100644
View
docs/audit/stage5-controller-capacity-20260724.txt 0 → 100644
View
docs/changelog-20260724-stage5-committee-fork1.md 0 → 100644
View
docs/design-decisions.md