WITHDRAWN: the designate "contradiction" was mine, not the bundle's
I raised, as an unresolved question for the operator, that the Stage-5 plan
deploys four designate applications while a phase-4 bullet says the bundle
ships "NO designate". There was nothing to resolve.

D-019 (v1 ships no cloud DNS) is SUPERSEDED by D-106, which REACTIVATES
Designate for VR1. DOCFIX-167 put all four designate applications into this
bundle.yaml on 2026-07-10, and phase-01-bundle-deploy.md:174 already says the
change "corrects this GATE's old 'NO designate (D-019)' text, since D-019 is
superseded". Stage 7 owns the DNS ACTIVATION -- per-DC zones + A/AAAA per the
D-008 bootstrap order, FQDN-SAN certs, the B5 os-public-hostname reversal --
explicitly not the charm deploy. Four designate applications in the plan is the
planned outcome; their absence would have been the defect.

The stale artifact was the phase-4 bullet alone, paraphrasing a gate text
phase-01 corrected 23 days earlier. Rewritten to state the D-106 reactivation
and the Stage-5/Stage-7 split. My annotation is deleted, not kept as history --
leaving it would mislead the next reader about a live deploy input. Step 4.4's
speculative designate caveat removed for the same reason.

Operator correction quoted in CURRENT-STATE and the changelog: VR0 -> VR1 is
ADDITIVE, and a manufactured contradiction costs next-step attention, which is
this project's named failure mode. Also recognised late: the dry-run's ignored
"name"/"variables" field warnings are the benign R11 pair phase-01 already
documents.

repo-lint 0 fail / 1 legacy warn.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HvCyrwvYTTcDYnRErfMsNf
1 parent 5b08ad8 commit 787f0d35a239466ed2a0bf7981a2d0956f5f50b2
@JANeumatrix JANeumatrix authored 1 day ago
Showing 3 changed files
View
docs/CURRENT-STATE.md
View
docs/changelog-20260802-deploy-input.md
View
runbooks/dc-dc-phase4-juju-bundle-per-dc.md