|
docs: reconcile workflow-doc Stage-3 section against repo (post D-121..D-125)
The dc-dc-deployment-workflow.md Stage-3 (Phase 2) section + gap register had drifted behind the rulings that landed through 2026-07-16. Repo wins; each correction grep-verified against the tree (hard rule 2): - Build/Gate/Owns rows: single-root -> D-123 Model B two-root (outer->bootstrap->inner->maas-register); vvr1-dc0 IS the rack; D-125 bridge-in per-DC ISP egress; Owns += D-121/122/123/124/125. - Authoring status: node sizing RULED (D-121/R-3 = 9/DC), config.xml retired (D-113(a2) REST), both roots instantiated + validate. - Replaced the stale "two blocking rulings landed 2026-07-15" note (D-121 "3 storage/16 VMs, 790 GiB, vault fork OPEN") with a current rulings summary: 9 nodes/DC (R-3), FIT 870/1024 (Model B), vault RULED (R-2), + D-123/124/125. - Rack source no longer a missing-module gap: vvr1-dc0 stood up by site-headend-install.sh --host-nodes. - Gap register: D-113(a2) OPEN->DONE in both places (banner + line 838) (template deleted, config_seed/config_iso_path retired). Stage-4 "node count/sizing undecided" -> RULED. Bottom line now stated honestly: Stage-3 authoring complete; execution is operator-gated (HELD NetBox addressing + deploy-time gates). Doc-only; no code/behavior change. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Ck6xh3jWQi5b3Su8Dx1LEH |
|---|
|
|
| docs/dc-dc-deployment-workflow.md |
|---|