|
Stage 5 dc0 redeploy: Path M teardown (clean) + ovn-central cert DELIVERY bug fixed
- Path M teardown of vr1-dc0 complete + clean: graceful drain (36->15) + juju resolved --no-retry (error-unit wedge, 15->3) + --force --no-wait (agents-stopped tail, 3->0). NO orphan (controller healthy), M.5 cascade clean (10 machines UNCHANGED, 9 Ready + 1 Deployed). Both --force and resolved operator-ruled (GA-R5). - dc-node-etchosts.sh: render runcmd: -> postruncmd: -- juju model-config forbids a top-level runcmd in cloudinit-userdata. The 08-04 fix proved the CONCEPT live but never the DELIVERY (harness graded cloud-init YAML, which accepts runcmd, not juju acceptance). Harness switched to postruncmd + NEW T10 (juju-accepted key, rejects bare runcmd), MUTATION-PROVEN, 10/10. Step 1.2b now live-passing; re-staged to rack. - M.6 rebuild to the deploy step: add-model (cred vr1-dc0-cred), spaces PASS 0 fatal, egress 8/8 PASS, dry-run PASS (9 machines, per-DC tags). Stage 5 remains OPEN. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01Fg98z7QyzwYUs8fsWCn728 |
|---|
|
|
| docs/CURRENT-STATE.md |
|---|
| docs/audit/stage5-dc0-redeploy-asexec-20260804.txt 0 → 100644 |
|---|
| docs/changelog-20260804-stage5-dc0-redeploy.md 0 → 100644 |
|---|
| scripts/dc-node-etchosts.sh |
|---|
| tests/dc-node-etchosts/run-tests.sh |
|---|