GA-R5 ruling: the D-139 GUA carve is sequenced BEFORE the Stage-5 deploy
Operator answer, exact utterance: "Apex push AND the MAAS/node GUA carve, then deploy".

D-139 execution steps 1-3 run before the bundle deploy, so the cloud is deployed once
on its final GUA addresses and nothing is re-addressed underneath it. The 2026-07-30
standing directive is satisfied in substance rather than literally.

Recorded, not inferred: steps 4-6 were NOT put, and step 6 has a deploy coupling this
ruling does not settle -- the per-DC VIP overlays carry v6 VIPs in the ULA range, so
deploying after steps 1-3 alone leaves GUA nodes with ULA VIPs. Own exchange owed
before Step 4. Neither ruling A nor B is touched; no new D-number (GA-R3: OPS).

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HvCyrwvYTTcDYnRErfMsNf
1 parent de33598 commit a9839e040118eff35f96d10e4d738c9a3934cff1
@JANeumatrix JANeumatrix authored 9 hours ago
Showing 2 changed files
View
docs/CURRENT-STATE.md
View
docs/design-decisions.md