GA register: Phase-2 ACCEPTED (external review); Phase-4 drafting directives recorded
Operator directives from the Phase-3 dispatch: G11 signs the post-probe
version; GA-R1 gains a ~350-line size budget + same-commit rotation to
as-builts; as-built division of authority (STATUS vs CONFIGURATION-of-
record); probe integrity rules. Recorded pre-dispatch so probes see only
committed state.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_018ZV3uqyU9oWoFTcwiE4a21
1 parent be1cd85 commit c49da7902b292ac8e943a1e6a5d872a2837202e6
@JANeumatrix JANeumatrix authored 13 hours ago
Showing 1 changed file
View
docs/audit/grounding-audit-20260718.md