| 2026-07-29 |

Ruling 3 commit 1: bundle.yaml is VIP-free; dc0's VIPs are now a RENDERED overlay
...
The 11 inline vip: lines are gone from bundle.yaml and live in
overlays/vr1-dc0-vips.yaml, GENERATED by scripts/render-dc-overlays.py from
render/values/vr1-dc0-vips.yaml -- the renderer's first real output.
placement's then-empty options: block was dropped rather than left parsing
as null. Ruling 3's dual-stack ADD is commit 2 and is NOT in here.
PROVEN NEUTRAL by the ruling's own named check: provider-bundle-check on the
pre-extraction bundle and on the merged pair produce line-for-line identical
output, same known designate failure included. A structural diff separately
confirmed only vip moved -- applications 56 -> 56, relations 108 -> 108,
every other key byte-identical.
The 11 inline comments were carried, not dropped: extracted verbatim by
parser rather than retyped, via new optional per-app comment support in the
renderer. An app with no comment emits none, so dc1 still reproduces
byte-for-byte at 1634 bytes. The B1/B5 tokens stay DEFINED in bundle.yaml's
header and the overlay header names that, so the references do not dangle.
The blast-radius repair is the bulk of this, and every item was found BEFORE
the edit by the read-only agent sweep:
- preflight.sh P2 validated the bare base (11 phantom failures post-move) ->
merged input.
- pre-flight-checks.sh CHECK 1 read the base as raw text and would have seen
ZERO VIPs. This is BLOCKER-1, fixed the ruled way and not by bumping the
count. Measured trap: the file sets IFS=$'\n\t', so a space-joined string
reached grep as ONE filename, grep exited 2, pipefail propagated and the
gate died silently mid-check. Fixed with a bash array.
- phase-01's RUN block gates juju deploy on 11/11/0 and would have read
0/0/0 and ABORTED THE DEPLOY. Both guards now span base + overlay, and a
second latent bug was fixed in the same edit: grep -c over two files prints
one count PER FILE, so the bare $( ) captured a two-line string and every
numeric test would have failed anyway. Now awk-summed; verified 11/11/0.
- phase-01's Octavia SAN derivation raised KeyError, swallowed by || true
into an empty VIP. Now reads the overlay, deriving 10.12.4.57.
- phase-00 teardown, dc-dc-phase4's "NO VIP edits" guidance, appendix-A L3,
and render-baseline's now-unverifiable bundle hash all repaired.
Harness 30 -> 31. The fixture base is now bundle + dc0 overlay, since that
pair is the deploy input; T16 renamed to match. NEW T31 asserts the bare base
fails for every clustered principal, so "deployed without its overlay" is a
tested state rather than an assumption.
Gauntlet ALL GREEN (85) on vcloud; repo-lint 0 fail / 610 files scanned.
Still red and expected: CHECK 1 at OK=11 want 13, and designate -- R11's
.61/.62 remain ruled-but-not-built, which is commit 2's job.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01HvCyrwvYTTcDYnRErfMsNf
|
| 2026-07-24 |

vr1-dc1 bundle render (9-node role-separated) + expansion review record
...
Render (committee Fork-2 hand-render), validated by the extended checker:
- bundle.yaml: machines "8"-"11" (tags=openstack) -> "0"-"8" role+DC tags (block
style); every `to:` re-homed (quorum trio -> control 0/1/2; nova-compute 3->2 on
compute 3/4; ceph-osd -> storage 5-8; scaled apps + utilities -> control);
ovn-chassis -> the 2 dc1 compute provider MACs (52:54:01:d1:04:02/05:02).
- overlays/vr1-dc1-machines.yaml (NEW): per-DC retag (machines-overlay merge is
VERIFY-LIVE at `juju deploy --dry-run`).
- overlays/dc-ha-scaleup.yaml: tokens rendered to logical control ids 0/1/2
(DC-neutral); header updated; stale ceph-osd-3 comment -> 4.
- provider-bundle-check.py: ovn-chassis MAC check skips the VR0 Pattern-A set on a
role-separated bundle (the validator CAUGHT a real YAML flow-comma render bug).
Validated: base + FULL dc1 deploy input (3 overlays, --dc vr1-dc1) PASS; harness
15/15; gauntlet ALL GREEN (78); repo-lint 0-fail.
Expansion review (3 read-only reviewers) recorded in
docs/audit/stage5-expansion-review-20260724.md: relations/bindings/subordinates
HOLD under role-sep (uniform 6-NIC, SEC-011); no channel/pin change; open
resolve-before-deploy items (vault VIP, v4-vs-dual-stack phasing) + deploy-gate
script gaps + VERIFY-LIVE gates. NetBox->deploy coupling routed to Chat as a new
PROPOSED D-number (Fork-2 escalation). No cloud state mutated.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VUjEb7onHpdqFHUnio6iVw
|
dc1 VIP overlay drafted (overlays/vr1-dc1-vips.yaml)
...
Per-DC VIP overlay for the vr1-dc1 proxy-method deploy (phase-4 Step 4): re-homes
the 11 API-service VIPs from bundle.yaml's vr1-dc0 bands into vr1-dc1's measured
bands (provider-public 10.12.4->64, metal-admin 10.12.8->68, metal-internal
10.12.12->72; host octets .50-.60 unchanged), sourced from lib-net vr1-dc1
PLANE_NAME. Base bundle.yaml stays the vr1-dc0 source of truth; overlay applied
only for the dc1 deploy. YAML valid (11 apps), repo-lint 0 fail.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VUjEb7onHpdqFHUnio6iVw
|
| 2026-07-16 |

Stage 3 (vr1-dc0) prep batch: D-121..D-124 rulings + substrate/rack wiring, HA overlay, NetBox importers
...
Prepares the VR1 Stage-3 DC substrate so the live steps reduce to review-plan-and-apply.
Authoring + offline validation only -- NO cloud mutation; every tofu apply, NetBox --commit,
and rack install stays operator-gated. Four decisions ruled this batch, all recorded:
- D-121 (ADOPTED): make the decorative single-unit control plane REAL. 14 services scale 1->3
(D-009's mechanical scale-up pulled into VR1); node layout = Option C (3 control + 2 compute +
3 storage/DC, sizing set) after a whole-host resource validation (256 vCPU/1024 GiB/10 TiB);
vault sub-ruling = v-a (MySQL-backed, charm-verify gated). Placement-balance rule for Stage 5.
- D-122 (ADOPTED): VR1 site shape -- nested-per-site containment, dark fiber East-West only,
dedicated per-site L3 ISP uplink, 2-NIC fabric-routed DC edge (LAN=provider-public, WAN=uplink),
per-site MAAS. Edge NIC count baremetal-matched (nodes 6, edge 2).
- D-123 (ADOPTED Model A): DC nodes vcloud-level; site-down = destroy the vr1-dc0-* group; MAAS
region on Office1 + a rack controller per DC (vvr1-dc0).
- D-124 (ADOPTED Scheme A): the Office1-region<->DC-rack management overlay -- a transit link on
the office1<->dc0 mesh leg; rack sizing 4/8192/80.
Code (all validated, NOT applied):
- OpenTofu: new modules/site-wan (NAT /24 uplink, provider-schema-confirmed); main.tf Stage-3
section -- vr1_dc0_wan, the 2-NIC edge, 8 Option C node VMs (for_each), the vvr1-dc0 rack
(two legs, static IPs from new vr1_dc0_rack_* tfvars -- NetBox-assigned, not invented), netem
held, mesh-link network_name output; stale vr1_dc1_planes comment fixed. Step-9 maas-vm-host
deliberately deferred (DOCFIX-179: its maas provider would force every plan to demand creds).
tofu validate Success; opentofu-validate 11/11.
- NetBox: dc-edge-wan-import.py (58/58) + dc-rack-mgmt-import.py (96/96) -- register the DC-edge
/24s + the rack transit/IP, dry-by-default, whole-plan preflight, operator-supplied literals.
- overlays/dc-ha-scaleup.yaml: the D-121 14-service HA scale-up (Stage-5), placement tokens +
rabbitmq min-cluster-size + hacluster cluster_count + re-declared vault-hacluster.
- scripts/site-headend-install.sh: rack-only mode (enrolls a DC rack to Office1's region).
- runbooks/dc-dc-phase2-tofu-dc-substrate.md: fix-forward (D-119 naming, Steps 4-5 REST-API,
D-121/122 folded in, stale gate corrected).
docs/session-ledger.md + dc-dc-deployment-workflow.md reconciled; three changelogs added.
Gauntlet ALL GREEN; repo-lint 0-fail (1 documented legacy WARN).
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Ck6xh3jWQi5b3Su8Dx1LEH
|
| 2026-07-10 |

DOCFIX-164: D-101 IPv6 family-matrix overlay, researched against real charm source (gap #13)
...
overlays/dc-dc-ipv6-family-matrix.yaml + docs/dc-dc-ipv6-charm-research.md.
Fetched real charm config/source (not memory): prefer-ipv6 is a real,
shared charms.openstack option, confirmed genuinely additive dual-stack
(not either/or) via charm-nova-cloud-controller's actual "Dual Stack VIPs"
commit; ceph-mon's own prefer-ipv6 is a straight switch, correct for the
ULA-only planes; OVN has no such option at all (confirmed by reading its
full config.yaml) and needs no overlay entry; vault's cert code has no
v4/v6 distinction, confirming D-109's SAN requirement is code-supported.
Found and deliberately did not paper over a real open risk: Octavia's
lb-mgmt-net has two real, still-referenced upstream IPv6 bug reports.
Excluded from the overlay pending an explicit operator decision.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01QrcJx8TUar7pYAvpGJw57A
|
| 2026-06-10 |
repo: sanitation sweep -- canonical phase-NN runbook + appendices; design-decisions D-001..D-042; canonical bundle; superseded files moved to remove/ for review
|
| 2026-05-22 |
|