DC0 deploy STEP A EXECUTED: outer apply 6/0/6 exact; G8+G9 CLOSED; convergence zero
...
Logged window dc0-deploy (as-executed log + index convention). G8 passed
in the apply session (six planes 0 leases, 0 attachments); validate
PASS; pre-apply capture equaled the recorded triple; the SAVED plan was
applied: 6 added / 0 changed / 6 destroyed. vvr1-dc0 RUNNING (108 vCPU,
416 GiB, autostart disable per D-127); vr1-dc0-uplink active; six vcloud
planes destroyed (Model B relocation); voffice1 + edge untouched (ids
1/2). Convergence re-plan: no differences (captured). CURRENT-STATE:
section 1 position, section 5 expected plan = ZERO DIFF (any diff is a
STOP), G8 + G9 rows CLOSED; active gate G10. Captures committed same
commit (C1/C2).
Revert: infra revert = runbooks/dc-dc-teardown-rollback.md decision tree
(NOT a blind destroy); docs revert = git revert this commit.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01VZbUeRE8weySLSGY1odrCi