G12 dc1 step C COMPLETE: 28/28 inner resources, 10/10 domains running
...
Inner apply from voffice1 (D-128 Plane 2): staging set mirrored from dc0
(branch switch preserving dc0 tfstate, dc1 key piped, known_hosts, 26.7
base local to the provider host, tfvars all-sourced). Plan 28/0/0 exact
with 54 pinned MACs verified. One fix-forward: serial-log staging dir
absent inside vvr1-dc1 (dc0 had it hand-made 07-20; queued to standup
DoD) -- dir created, resume 10/0/0, exit 0. Convergence zero diff; edge
at the 26.7 login prompt (D-112 datapoint #2). Captures:
docs/audit/inner-{plan,converge}-20260722-dc1-stepC.txt.