| 2026-07-23 |
Mirrors installed both racks, syncs RUNNING; dc1 edge pf incident resolved; HOME fix (harness 19)
...
JANeumatrix
committed
14 minutes ago
|
|---|---|
|
dc-mirror.sh shipped (D-135 item 1): per-DC apt+UCA mirror, harness 18/18, gauntlet 77 ALL GREEN
...
JANeumatrix
committed
38 minutes ago
|
|
|
L10 repair: CURRENT-STATE owed by the D-135 commit + owned lint-mask defect (item 8)
...
JANeumatrix
committed
48 minutes ago
|
|
|
Stage 4 carve EXECUTED both DCs: D-133 flat statics + D-134 bands live in MAAS
...
JANeumatrix
committed
1 hour ago
|
|
|
D-134 AMENDED: contiguous band table (Option B swap), utterances quoted
...
JANeumatrix
committed
3 hours ago
|
|
|
|
|
|
Stage 4 OPEN + D-133 ADOPTED: flat per-NIC carve (VR1), hw-faithful NICs next deployment
...
JANeumatrix
committed
4 hours ago
|
|
|
Session bookend: queue-pass CLOSED (ledger summary, changelog archived, scan fix)
...
JANeumatrix
committed
14 hours ago
|
|
|
D-068 Q3 RULED + delivered: monthly-review checks in ops-update-procedure 0c
...
JANeumatrix
committed
15 hours ago
|
|
|
D-068 Q2 RULED: Roosevelt baselines on 1.8 + funded remediation track (structure only)
...
JANeumatrix
committed
15 hours ago
|
|
|
D-068 Q1 RULED: rehearsal-scoped EOL Vault acceptance, posture 1b (utterance quoted)
...
JANeumatrix
committed
15 hours ago
|
|
|
D-068 item 1: re-scoped Vault migration plan drafted (options paper; nothing adopted)
...
JANeumatrix
committed
16 hours ago
|
|
|
G13 CLOSED: office1 edge bundle -- qga channel live, 26.7.1, os-iperf in (operator-approved)
...
JANeumatrix
committed
16 hours ago
|
|
|
G13 plugin leg PARTIAL: qga installed, os-iperf refused pending 26.7.1 (measured)
...
JANeumatrix
committed
17 hours ago
|
|
|
L10 repair: CURRENT-STATE carries the SEC-010 re-assert status (GA-R1/C1)
...
JANeumatrix
committed
18 hours ago
|
|
|
Session bookend: G12 dc1 CLOSED + merged (edge->commission->close in one session)
...
JANeumatrix
committed
20 hours ago
|
|
|
G12 dc1 close-out: consolidation + skill sweep + CURRENT-STATE (G12 CLOSED)
...
JANeumatrix
committed
20 hours ago
|
|
|
G12 dc1: SEC-016 power key wired + commissioning 9/9 READY -- [V] leg complete
...
JANeumatrix
committed
21 hours ago
|
|
|
G12 dc1: rack-net install + region MAAS config + SEC-016 power-key ruling
...
JANeumatrix
committed
21 hours ago
|
|
|
G12 dc1: edge bootstrap + v4 addressing COMPLETE (D-112c + D-113a2 proven on 26.7)
...
JANeumatrix
committed
21 hours ago
|
|
| 2026-07-22 |
G12 dc1: D-125 egress gate PASS (two identical runs, isolation confirmed)
...
JANeumatrix
committed
23 hours ago
|
|
G12 dc1 step C COMPLETE: 28/28 inner resources, 10/10 domains running
...
JANeumatrix
committed
1 day ago
|
|
|
G12 dc1 step B COMPLETE: transit live, rack enrolled, SEC-010 both ends, 26.7 staged
...
JANeumatrix
committed
1 day ago
|
|
|
G12 dc1: apex --commit executed + substrate step A applied (5/0/0 exact, converged)
...
JANeumatrix
committed
1 day ago
|
|
|
G12 dc1: item-3 substrate landed + harness reconcile (gauntlet 76 ALL GREEN)
...
JANeumatrix
committed
1 day ago
|
|
|
Session bookend (successor-landed): G12 dc1-authoring session disconnected mid-item-3
...
JANeumatrix
committed
1 day ago
|
|
| 2026-07-21 |
G12 dc1: apex confirm-free captured; dc-rack-mgmt-import gains per-site (--site) dc1 support
...
JANeumatrix
committed
1 day ago
|
|
G12 [R] leg CLOSED: vr1-dc1 addressing RATIFIED (D-124 amendment 2026-07-21, GA-R5)
...
JANeumatrix
committed
1 day ago
|
|
|
D-100 gap #11: netem placeholder CONFIRMED STANDING until Roosevelt link spec (GA-R5)
...
JANeumatrix
committed
1 day ago
|
|
|
D-071 point 4 RULED + D-071 ADOPTED closure: all four update-policy points ruled (GA-R5)
...
JANeumatrix
committed
1 day ago
|