History for openstack-caracal-dc-dc / docs / changelog-20260719-dc0-deploy-stepB.md
2026-07-20
@JANeumatrix
DC edge ADDRESSED: WAN 172.30.2.2/24 + default gw, LAN -> 10.12.4.1/22; edge egresses 0% loss ...
JANeumatrix committed 1 day ago
@JANeumatrix
D-125 egress isolation gate: PASS / CLOSED -- bridge-in proven end to end (2 identical runs) ...
JANeumatrix committed 1 day ago
@JANeumatrix
CORRECTION (GA-R1/C2): D-125 rack-bridge follow-up was CONFOUNDED, not evidence ...
JANeumatrix committed 1 day ago
@JANeumatrix
D-125 egress gate executed (throwaway VM, as ruled): bridge-in PROVEN, upstream NAT egress fails -- gate OPEN pending one sudo measurement ...
JANeumatrix committed 1 day ago
@JANeumatrix
DC edge bootstrap: D-112(c) console chain complete + API key minted; D-113(a2) PROVEN on 26.7 ...
JANeumatrix committed 1 day ago
@JANeumatrix
Stage-close queue: operator-directed OPNsense 26.7 changelog/docs review (findings->proposals->rulings; D-129 anchor) ...
JANeumatrix committed 1 day ago
@JANeumatrix
Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes ...
JANeumatrix committed 1 day ago
@JANeumatrix
Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening ...
JANeumatrix committed 1 day ago
@JANeumatrix
Step B transit reach ESTABLISHED: voffice1 .1/30 applied (Kea re-key incident fixed); vvr1-dc0 netplan set-name root cause fixed; zero-diff converged ...
JANeumatrix committed 1 day ago
2026-07-19
@JANeumatrix
Step B prereq: voffice1 transit NIC authored (172.31.0.1/30 region end, D-124); ruling recorded; expected plan 1/1/1 ...
JANeumatrix committed 1 day ago