diff --git a/docs/CURRENT-STATE.md b/docs/CURRENT-STATE.md index 9638525..474ccbc 100644 --- a/docs/CURRENT-STATE.md +++ b/docs/CURRENT-STATE.md @@ -522,12 +522,12 @@ Roosevelt inter-DC link spec), trigger defined: re-tune via a gated apply when the spec exists, not before. 3. D-068 -- Vault substrate hardening. Items 2-3 RULED 2026-07-21; item 1 - (Vault version) re-scoped plan DRAFTED 2026-07-23 - (`docs/D-068-vault-migration-plan-draft.md`; D-068 amendment of the same - date) -- item 1 is now PRESENTABLE as three separate GA-R5 questions (Q1 - interim rehearsal posture; Q2 Roosevelt path, options 2a-2d; Q3 - triggers/review), with verify items V1-V5 owed before any Q2 ruling. - Evidence base: `docs/D-068-vault-1.8-vs-1.16-analysis.md`. + re-scoped plan DRAFTED 2026-07-23 + (`docs/D-068-vault-migration-plan-draft.md`). Q1 RULED 2026-07-23 + (rehearsal-scoped EOL risk-acceptance, posture 1b -- amendment in + design-decisions.md is the authority). OPEN: Q2 (Roosevelt path, + options 2a-2d; verify items V1-V5 owed before ruling) + Q3 (review + mechanics), each its own exchange. 4. D-071 -- ADOPTED 2026-07-21: all four policy points ruled (monthly review trigger; patch-only controller jumps; standing order; in-channel-only refreshes), each its own GA-R5 exchange -- status diff --git a/docs/changelog-20260723-queue-pass.md b/docs/changelog-20260723-queue-pass.md index f99247a..ea374cd 100644 --- a/docs/changelog-20260723-queue-pass.md +++ b/docs/changelog-20260723-queue-pass.md @@ -216,3 +216,14 @@ section 8 item 3 + G15 row updated (same commit). NOTHING adopted. - REVERT: delete the draft doc + the amendment block; restore the two CURRENT-STATE passages. + +## Item 13 -- D-068 Q1 RULED (rehearsal-scoped EOL acceptance, 1b) + +- RULING (GA-R5): question + exact utterances quoted in the design-decisions + amendment block (the authority). Operator volunteered Q1/Q2/Q3 answers in + one exchange; per GA-R5 (batch adoptions invalid) each is being confirmed + and recorded INDIVIDUALLY -- this item records Q1 only. The 1a-vs-1b + variant was pinned to 1b in the confirmation text before recording. +- CURRENT-STATE section 8 item 3 updated (same commit). No software, bundle, + or live change -- a recorded posture only. +- REVERT: remove the amendment block + restore the section-8 passage. diff --git a/docs/design-decisions.md b/docs/design-decisions.md index f2ba830..aef416c 100644 --- a/docs/design-decisions.md +++ b/docs/design-decisions.md @@ -4416,3 +4416,20 @@ **Status:** item 1 OPEN / presentable (draft exists). Items 2-3 unchanged (RULED 2026-07-21). **Related:** D-069, D-071 (review vehicle), D-132 (same design window). + +## D-068 -- AMENDMENT (2026-07-23): item 1 / Q1 RULED -- rehearsal-scoped EOL risk-acceptance, posture 1b + +Question as presented (migration-plan draft section 2; presented with options 1a/1b/defer): +"D-068 Q1: what interim posture covers EOL Vault 1.8.8 for the rehearsal phases (VR0 + VR1)?" +Operator answer, exact utterances: "Q1: Yes, record it." then, on the exact recording text +(1a-vs-1b resolved to 1b consistent with the operator's Q3 answer), "Confirmed (Recommended)". + +RULED: explicit risk-acceptance of EOL Vault 1.8.8, scoped to the REHEARSAL phases (VR0 +testcloud + VR1 when Stage 5 brings Vault) ONLY -- rationale: no tenant data, no external +surface, metal-internal listener, operator-held unseal (D-069). Production/Roosevelt is +explicitly NOT covered -- Q2 owns it. Posture 1b: the acceptance carries a Vault 1.8.x +CVE-scan line in the D-071 monthly review (line lands via the Q3 mechanics ruling). + +**Status:** Q1 RULED 2026-07-23. Item 1 remains open on Q2 (Roosevelt path) + Q3 (review +mechanics), each its own exchange. **Related:** D-069, D-071 (vehicle), the 2026-07-23 +draft amendment above.