QUEUED RULINGS -- Stage-5 grounding audit (2026-07-27)

Nothing here is adopted. Every item is PRESENTED, never picked (hard rule 1; GA-R5: PROPOSED means present options). Each question is a SEPARATE exchange -- GA-R5 rule 1 makes a batch adoption INVALID, so answering "yes to all" rules NOTHING and the session that reads this must stop and re-ask.

How to use this file. Answer questions ONE AT A TIME. Write your exact words on the OPERATOR UTTERANCE: line. A ruling exists only once its Status block quotes the question AND your exact utterance, dated, committed and pushed -- before any dependent work starts. An ambiguous or template answer rules nothing.

Evidence for every claim below is in docs/audit/stage5-committee-raw-20260727.md (verbatim lens returns) and docs/audit/stage5-live-measurement-20260727.txt (this session's own measurements). Finding IDs are cited so nothing here has to be taken on trust.

Ordering note: R1, R2 and R3 change what gets deployed. They should be answered before the rest, because several later questions have different right answers depending on them.


PART A -- STAGE-5 BLOCKING

These must be answered before juju deploy. Each one, left unanswered, either stops the deploy or bakes in a state that is expensive to reverse on a live cloud.


R1. The Ceph OSD device does not exist on any node

Finding: L2-1 (measured twice -- virsh domblklist on both racks AND MAAS physicalblockdevice_set on all 18 nodes). Verified independently by this session.

bundle.yaml:560 sets osd-devices: /dev/vdb. Every one of the 18 VR1 node VMs has exactly ONE block device, vda. opentofu/modules/node-vm/main.tf:104-125 declares a single disk and neither substrate root has any OSD-disk variable. The /dev/vdb line is a VR0 as-built comment ("libvirt-attached, MAAS-untracked") -- VR0 hosts had an attached second disk; VR1 nodes never did.

Consequence if unanswered: ceph-osd deploys onto four storage nodes and finds no device. Ceph never forms, and everything storage-backed behind it stalls.

Options:

  • (a) Add an OSD volume to modules/node-vm and re-apply BOTH substrate roots. Closest to Roosevelt (real machines have real disks), but it re-opens the substrate on 18 running-but-powered-off nodes and both roots currently plan ZERO DIFF -- that property is deliberately being spent.
  • (b) Re-point osd-devices at a directory or partition path on the existing vda. Cheapest, no substrate change, but it rehearses a Ceph layout Roosevelt will not use, which cuts against MINIMIZE DELTA TO ROOSEVELT.
  • (c) Re-shape the storage role (e.g. fewer, larger storage nodes with a dedicated disk each).

OPERATOR UTTERANCE: "Add an OSD volume to node-vm (Recommended)" -- RULED 2026-07-27. R1 IS CLOSED. Recorded as a D-121 AMENDMENT (the governing decision already ratifies modules/node-vm sizing, and its own capacity re-validation already budgeted "Ceph disk re-run for 4 storage/DC = PASS 5.31 TiB" -- the disk was budgeted and never built). Two scope corrections landed with the ruling: it is 8 volumes, not 18 (ceph-osd is placed on the four storage nodes per DC only), and the apply is a SEPARATE operator-gated step with four preconditions, including verifying that re-commissioning preserves the D-134 statics and pinned MACs BEFORE the apply -- the 2026-07-20 MAC-regeneration incident is the precedent. Full text: docs/design-decisions.md, "D-121 AMENDMENT 2026-07-27".


R2. There is no IPv6 anywhere in the DC substrate, but dual-stack is RULED

Finding: L2-3 (measured). D-101's RULING NOTE of 2026-07-25 records your exact words -- "Dual stack to be used where IPv4 is required, IPv6 where IPv6 only makes sense" and "Dual stack deployment for DC0 and DC1. This is the deployment when the dual-stack is added" -- with the stated effect that "the v4-only phasing option ... is CLOSED, for BOTH DC0 and DC1 in this deployment."

Measured reality: exactly ONE IPv6 subnet exists cloud-wide (2602:f3e2:f01:100::/64 on the Office1 base fabric). None of the 12 DC plane fabrics carries an IPv6 subnet. Zero IPv6 links across all 18 nodes; every node reports default_gateways.ipv6 = NONE. D-101's own family matrix requires ULA on data-tenant, storage and replication and a ULA leg on metal-admin/metal-internal -- none of which has any MAAS v6 presence to bind against. D-101's own "Remaining open item" is the un-assigned NetBox literals: the org ULA /48 and the per-DC GUA carve.

This is the single largest fork in the audit. It is BLOCKING because addresses become as-built Keystone endpoints and Vault-issued cert SANs at deploy time.

Options:

  • (a) Assign the ULA /48 and per-DC GUA carve in NetBox, carve them into MAAS, and deploy dual-stack as ruled. Honours D-101; adds real work before Stage 5.
  • (b) Deploy v4-only now and add v6 legs post-deploy. This CONTRADICTS a ruling you already made -- it would need an explicit amendment, not a silent choice, and re-addressing endpoints and re-issuing SANs afterwards is the expensive path.
  • (c) Deploy dc1 v4-only as a deliberate, recorded rehearsal exception while dc0 goes dual-stack, making the v4/v6 delta itself the experiment (the D-135 per-DC-difference pattern applied to address family).

OPERATOR UTTERANCE: "Carve v6 and deploy dual-stack as ruled (Recommended)" -- RULED 2026-07-27. R2 IS CLOSED. Recorded as a D-101 RULING NOTE (re-confirmation, no amendment -- docs/design-decisions.md is the authority). Consequence that changes the plan: D-101's "Remaining open item" (the org ULA /48 and per-DC GUA carve), until now carried as non-blocking "pending NetBox assignment", is now a STAGE-5 PRECONDITION -- dual-stack cannot deploy against literals that do not exist. R9 and R11 both inherit "dual-family" from this. The L3-9 overlay collision must be reconciled BEFORE either authority location is populated; note the dangerous direction is the one that PASSES (vips overlay last silently drops every v6 leg and reports green). R8 is NOT resolved by this ruling. Immediate next sub-question, queued not ruled: WHICH literals -- see R2a below.


R2a. WHICH IPv6 literals? (opened by the R2 ruling)

R2 directs that the org ULA /48 and per-DC GUA carve be assigned; it does not assign them. This is an apex assignment and under D-136's unruled coupling the working apex is office1-netbox (10.10.1.10), with netbox.baldurkeep.com a read-only v1 reference.

What is already measured: the only IPv6 in the whole cloud today is 2602:f3e2:f01:100::/64 on the Office1 base fabric, so a GUA allocation of 2602:f3e2:f01::/48 demonstrably exists and is partly in use. The ULA side has no existing assignment at all.

I am deliberately NOT proposing specific prefixes -- picking your address space is yours, and hard rule 2 forbids me inventing a literal. What needs deciding is the SHAPE, after which the actual values are a mechanical carve:

Options:

  • (a) ULA per RFC 4193 (pseudo-random /48), with a per-DC /56 out of it and a per-plane /64; GUA carved per-DC /56 out of the existing 2602:f3e2:f01::/48. Symmetric with the D-134 v4 band discipline.
  • (b) ULA only on the v6-only planes (data-tenant, storage, replication) with GUA reserved for provider-public, per D-101's family matrix read strictly.
  • (c) Assign in NetBox first and let the carve fall out of the apex record -- couples this to the D-136 render-pipeline question rather than pre-empting it.

OPERATOR UTTERANCE:


R3. The MTU budget is in neither of D-101's two permitted states

Finding: L2-5 (measured on both racks and across all 17 MAAS VLANs).

D-101's Tenant/MTU sub-policy allows exactly two shapes: raise the underlay to jumbo (9000) end-to-end so tenant MTU stays 1500, OR accept 1500 and pin tenant MTU to about 1444 consistently across ovn geneve, tenant-network MTU and amphora. It also says: "The measured underlay MTU is a Phase-0 gate -- do not assume jumbo."

Measured: the six plane bridges on both racks are MTU 9000; every MAAS VLAN record (17/17) says 1500; the rack transit leg enp1s0 is 1500, so cross-DC replication is not jumbo end-to-end; and grep -i mtu bundle.yaml overlays/*.yaml returns NOTHING. That is neither branch. scripts/dc-dc-mtu-geneve-budget.sh exists and correctly refuses to guess (FAIL: --underlay-mtu is REQUIRED), but has never been run to a recorded verdict.

Consequence if unanswered: the deploy SUCCEEDS and the failure appears later as tenant/geneve blackholing -- D-101 names this "the classic nested-OpenStack failure mode". It is a bundle option that must be set BEFORE deploy.

Options:

  • (a) Raise the rack transit and the MAAS VLAN records to 9000 so the underlay is genuinely jumbo end-to-end, and keep tenant MTU at 1500.
  • (b) Accept a 1500 underlay and pin ~1444 consistently across ovn geneve, tenant-network MTU and amphora, set explicitly in the bundle.

OPERATOR UTTERANCE:


R4. D-134's reserved address bands exist in prose only

Finding: L2-2 (measured).

MAAS holds exactly THREE ipranges cloud-wide and ALL THREE are type=dynamic. There are ZERO type=reserved ranges anywhere. maas admin subnet unreserved-ip-ranges reports the .50-.99 VIP band as allocatable on 12 of 12 DC plane subnets. Only the node statics and the .201-.254 dynamic ranges are protected. The tool that creates these reservations, phase-00-maas-standup.sh, REFUSES to run for any non-VR0 DC (:136), so no VR1 path to create them exists.

Consequence: nothing stops MAAS handing a VIP-band address to a Juju/LXD container during the deploy, and phase-04-network-verify.sh:100 already hard-fails if the FIP pool is not a reserved iprange.

Options:

  • (a) Create the reserved ipranges on all 12 subnets AND carve the FIP pool now, as one gated mutation batch before deploy.
  • (b) Create the VIP-band reservations now; defer the FIP pool to phase-04 where its own verifier expects it.
  • (c) Accept the bands as unreserved for the rehearsal and rely on static assignment, recording the risk explicitly.

OPERATOR UTTERANCE:


R5. Designate ships in the bundle, so Stage 5 will deploy it -- and that breaks Stage 7's gate

Finding: L6-1, corroborated by L3-2.

bundle.yaml carries live designate, designate-bind, designate-mysql-router and designate-hacluster blocks plus 8 relations (DOCFIX-167 closed that on 2026-07-10). So juju deploy ./bundle.yaml deploys Designate at Stage 5. But Stage 5's own runbook says the bundle "explicitly ships NO designate", and Stage 7 Step 5's gate requires "the diff shows ONLY the new designate/... applications being added" -- which can never be true if they are already there.

Options:

  • (a) Suppress Designate for the Stage-5 deploy (a subtractive overlay, or a rendered per-stage bundle) and keep Stage 7's incremental-add shape intact.
  • (b) Accept Designate landing at Stage 5 and rewrite Stage 7 Steps 1/5 into a "configure, not deploy" shape. Caveat worth weighing: D-106's own bootstrap order puts os-public-hostname + FQDN-SAN certificates BEFORE Designate; option (b) inverts that order.

OPERATOR UTTERANCE:


R6. Whether to apply the HA scale-up overlay at Stage 5

Finding: L6-4.

overlays/dc-ha-scaleup.yaml sets ceph-radosgw and designate to num_units: 3 with cluster_count: 3. But Stage 6's radosgw multisite procedure and the DOCFIX-165 script behind it are single-unit-shaped: measured, dc-dc-radosgw-multisite.sh --help exposes master-init ... --unit U, one unit, with no all-units mode, and the runbook says juju run ceph-radosgw/0 restart. Realm/period membership would land on one of three gateways and Stage 6's Step-4 gate could false-green.

Scaling 1 -> 3 after the fact is a live-cloud change, which is why this is a Stage-5-time decision.

Options:

  • (a) Apply the HA overlay at Stage 5 and fix the Stage-6 radosgw path to be multi-unit-aware first.
  • (b) Deploy single-unit at Stage 5 and scale up after Stage 6's multisite work, accepting a live-cloud scale-out later.

OPERATOR UTTERANCE:


R7. Do the two DCs share one Octavia CA, or get independent trust domains?

Finding: L7-6. The runbook itself flags this correctly and says it must not silently default to reuse -- but the call has never been made.

overlays/octavia-pki.yaml is a single unscoped path holding CA private keys plus a plaintext issuing-CA passphrase. Reusing it across both DCs puts one amphora control-plane CA private key across two clouds that D-100 defines as independent. Note the contrast one step later in the same runbook: per D-109 each DC's Vault is its OWN independent root CA, no regional root-of-trust.

For a commercial multi-tenant cloud with hard tenant isolation, shared-CA is the weaker posture -- but it is your call, and the rehearsal cost differs.

IMPORTANT -- the runbook offers you a choice that is currently impossible on one side. Lens 5 (L5-3) measured the generator: runbooks/phase-01-bundle-deploy.md:369-373 reads the octavia VIP out of bundle.yaml and hard-gates it with grep -qE '^10\.12\.4\.[0-9]{1,3}$' || { echo "FAIL: implausible VIP -- stop"; exit 1; }. dc1's octavia VIP is 10.12.64.57 and lives in overlays/vr1-dc1-vips.yaml:37, not in bundle.yaml at all. Its CN and SAN are hardcoded octavia-controller.omega.dc0.vr0.cloud.neumatrix.local and the CA subject is /CN=VR0 DC0 Omega Cloud Octavia Controller CA. So option (a) requires a generator fix first, and option (b) bakes a dc0 CN/SAN into dc1's Octavia trust domain. Also note runbooks/phase-01-bundle-deploy.md:144-145 hard-ABORTS the deploy if the overlay is absent -- which it currently is.

Options:

  • (a) Regenerate fresh per-DC Octavia PKI -- independent trust domains per DC, consistent with D-109's per-DC Vault root. Requires fixing the generator's dc0-frozen VIP gate and CN/SAN literals first (a DOCFIX, no choice in it).
  • (b) Reuse the existing CA across both DCs for the rehearsal, recording both the divergence from D-109's per-DC posture AND the dc0 CN/SAN in dc1's chain.
  • (c) Fix the generator now and defer the trust-domain decision until it can actually be executed either way.

OPERATOR UTTERANCE:


R8. Octavia lb-mgmt-net address family

Finding: L6-9. Register item 13 carries the same open fork.

Stage 5's runbook states plainly that "Octavia's lb-mgmt-net IPv6 support is a real, open risk, not resolved" and that it must be decided before the Ceph-over-v6 / geneve-over-v6 gate is declared closed. Stage 6's ENTRY condition requires that gate to have passed, yet Stage 5's own text sanctions recording "blocked on Step 6" -- so Stage 5 can close without producing Stage 6's precondition, which GA-R6 E3 forbids resolving by conditional close.

This is downstream of R2: if R2 goes v4-only, this question largely dissolves.

Options:

  • (a) Pin lb-mgmt-net to IPv4 for this deployment regardless of R2, and record it as a scoped exception to the dual-stack ruling.
  • (b) Attempt IPv6 lb-mgmt-net and make it a named Stage-5 verification.
  • (c) Defer until R2 is answered, then re-present.

OPERATOR UTTERANCE:


R9. Where do dc1's OpenStack-layer network literals live?

ANSWER R2 FIRST. R2 decides what the VIP literals ARE, and this question only asks where they live. If R2 goes v4-only, overlays/dc-dc-ipv6-family-matrix.yaml drops out of the deploy input and this becomes materially simpler. If it goes dual-stack, the per-key vip: REPLACE collision that L3-9 measured -- one overlay order hard-fails with ten "vip not a triple" errors, the reverse order silently drops EVERY v6 leg and still reports PASS -- has to be solved BEFORE either authority location is populated, or you will populate it with the wrong values.

Finding: L1-1 (with an explicit guard), extended by L7-10 and L7-3.

scripts/lib-net.sh's vr1-dc1 arm unsets VIP_PREFIX_*, FIP_POOL_*, VIP_COUNT_EXPECT and KEYSTONE_VIP_DEFAULT on the stated grounds that they are "NOT yet ruled/measured". They have since been ruled (D-134 amendment, 2026-07-23) and built (overlays/vr1-dc1-vips.yaml). Any Stage-5 script that correctly calls the selector now dies under set -u on a value that exists.

GUARD -- do not let this be "fixed" mechanically. That arm unsets TWO groups for TWO different reasons. METAL_INTERNAL_VID and METAL_INTERNAL_IFACE are correctly unset: D-133 abolished the VLAN-103 / br-internal stack for VR1 and those facts genuinely do not exist. Only the VIP/FIP/keystone group is superseded.

Compounding context (L7-3, measured): of 27 lib-net.sh consumers, only 6 call lib_net_select_dc at all. The rest source it unconditionally and silently get VR0/dc0's literals -- so Stage 5 Steps 7-9 would write dc0's 10.12.4/8/12 values against a DC whose planes are 10.12.64-84. Whichever option you pick, that consumer sweep is the larger half of the work.

Options:

  • (a) Populate lib-net.sh's dc1 arm from the D-134 amendment -- lib-net.sh stays the single authority for network literals.
  • (b) Re-point the phase-0* scripts at overlays/vr1-dc1-vips.yaml as the authority, leaving lib-net.sh for substrate facts only -- closer to where D-136 would eventually take this.

OPERATOR UTTERANCE:


R10. On what basis does Stage 5 start against a red preflight?

Finding: L1-9, with this session's measurement.

Stage 5's stated entry gate is "preflight.sh PASS". Measured today, preflight exits 1, and the red set is exactly the known one: P4's missing overlays/octavia-pki.yaml (a gitignored secret, absent by design), P4's "MAAS unreachable from the jumphost" (expected -- the region is on voffice1), and P5's 7 credential findings. Nothing new has joined. But "PASS" is unreachable as written, so the gate as stated can never authorise Stage 5.

Note this interacts with L4-2: P3 currently verifies ZERO of 33 charm-channel pins because juju is not installed on the host preflight runs on.

Options:

  • (a) Re-express the Stage-5 entry gate as a NAMED subset that must be green (e.g. P1, P2 and P5-with-known-residuals), with the known-red items listed as accepted preconditions.
  • (b) Fix the reds first -- place the octavia overlay, run preflight from the headend where MAAS is reachable, remediate the 7 credential findings.
  • (c) Record a dated, explicit exception basis for this stage only.

OPERATOR UTTERANCE:


R11. Vault and Designate both have HA intent and no VIP

ANSWER R2 FIRST. Whether the VIPs you add here are single-family or dual-family follows directly from R2. Adding v4-only VIPs and then re-doing them as dual-family means re-issuing certificate SANs against changed endpoints on a live cloud.

Finding: the vault half was already recorded; L3-2 found the SECOND case.

grep -n 'vip' bundle.yaml returns exactly 11 lines -- none for vault, none for designate. Both are scaled to 3 with an hacluster subordinate related and cluster_count: 3. provider-bundle-check.py:133-135 skips any app with no vip (if not vip: continue), which is why neither has ever been flagged.

Compounding (L4-3, verified by this session): cluster_count is checked NOWHERE in scripts/ or tests/ -- a 3 -> 1 rewrite of all 20 occurrences yields a byte-identical PASS. So neither before nor after the deploy does anything assert that HA is real (L4-10: cloud-assert.sh reports "Cluster ID uniform across units" over a SINGLE unit).

Options:

  • (a) Add per-DC VIPs for both vault and designate in the symmetric overlay shape, and extend the checker to fail on any app with an hacluster relation and no VIP, plus any cluster_count that does not match its principal's num_units.
  • (b) VIPs for both, checker work deferred to a follow-up.
  • (c) Deploy them without VIPs deliberately (recording why consumers reaching a unit address is acceptable here).

OPERATOR UTTERANCE:


PART B -- STANDING / NOT STAGE-5 BLOCKING

Real, evidenced, and safe to answer after Stage 5 starts. Kept separate so the eleven above are not diluted.


R12. G17's scope: does it carry the node time-source check?

Finding: L1-8. docs/CURRENT-STATE.md:852 lists only the artifact-reachability commands, while docs/dc-dc-deployment-workflow.md:206 says "Node-side reachability and the node time source are gate G17" and the phase-4 runbook requires chronyc sources to show the MAAS-served source, not the DC edge (D-129(iv)). CURRENT-STATE also self-contradicts on whether DoD bullet 6 is STRUCK or awaiting a DOCFIX. The observation window is one-time -- first boot.

Separately (L4-7), G17's check as written cannot fail: curl -sI exits 0 on 404/500 and the dc0 URL is an autoindex root that answers 200 with nothing behind it.

Options: (a) fold time verification into G17's [V] text and fix the check to assert content with an exit-code predicate; (b) give time verification its own gate row; (c) confirm it is STRUCK and remove the two conflicting surfaces.

OPERATOR UTTERANCE:


R13. Credential reproducibility -- convert mint-refs now, or build creds-mint.sh first?

Finding: L7-7 (measured: 30 rows across 16 ids carry mint-ref=operator-terminal; grep -rnI "ssh-keygen" . returns ZERO hits repo-wide).

Lens 7's assessment is worth quoting because it changes the shape of the fix: the sharp edge is VR1-PRESENT, not Roosevelt-future -- SEC-007/-015 make edge SSH the only management path, so a jumphost rebuild locks you out of both DC edges TODAY. And the minimum fix needs no new tool: record each mint invocation as a numbered runbook step and flip those rows' mint-ref from operator-terminal to runbook:<path>:<step>, which the existing S4 check already resolves. creds-mint.sh is orthogonal -- it prevents the NEXT unregistered mint; it does not make an existing key reproducible.

Options: (a) convert the six edge/service/power key rows to runbook: refs before Stage 5 (they are the unrecoverable-in-place ones); (b) build and rule creds-mint.sh first, since Stage 5 is the largest minting event; (c) both, in that order.

OPERATOR UTTERANCE:


R14. The register cannot express a RULED exception

Finding: carried from the 2026-07-27 close and re-measured today -- 3 of the 7 standing credential findings are S5 power-key asymmetries that SEC-016 RULED to be correct by design. The register has no way to say "this asymmetry is ruled", so it reports a permanent red that a reader learns to ignore. That is how a real finding gets lost.

Options: (a) add a ruled-exception field to the matrix, citing the SEC/D number, which the checker honours and prints; (b) leave it red and rely on prose; (c) rework the S5 rule so a ruled per-DC divergence is representable.

OPERATOR UTTERANCE:


R15. Should the gauntlet and repo-lint pin a floor?

Finding: L4-8 and L4-1, both verified by this session.

run-tests-all.sh counts what it DISCOVERS and compares that count to nothing, so a renamed or deleted harness is neither run nor failed and the gauntlet still prints ALL GREEN. repo-lint reports PASS (0 fail, 0 warn) over ZERO files given a one-character typo. Both are the gates every stage close cites. The fixes are small and mechanical, but they change what "green" means, so they are worth your explicit sign-off rather than my assumption.

Options: (a) add a floor to both (minimum harness count; refuse a non-directory root and a zero-file scan); (b) floor on the gauntlet only; (c) leave as-is and rely on the operator noticing a changed count.