Plane IPAM complete on the new region: 24/0 PASS, existing tooling only
...
dc-plane-ipam.sh check vr1-dc0 goes from pass 7 / fail 17 to pass 24 /
fail 0, exit 0. Two idempotent applies, dry-run first, every write read
back: 13 D-134 reserved bands plus the FIP pool, then the 5 missing v6
plane subnets each created on the same MAAS vlan as its v4 twin.
No new code was needed. The tool's forced sequencing also proved itself --
the reserve run skipped every v6 band with 'not in MAAS yet, run carve-v6
first' rather than failing or silently no-opping, so running the two out of
order is safe.
This is the step that justifies the tunnel architecture: carve-v6 derives
its prefixes from the NetBox apex, reachable only from voffice1, while the
target region is reachable only via the rack. Neither host alone could have
run it.