History for openstack-caracal-dc-dc / docs / CURRENT-STATE.md
2026-07-21
@JANeumatrix
G12 [R] leg CLOSED: vr1-dc1 addressing RATIFIED (D-124 amendment 2026-07-21, GA-R5) ...
JANeumatrix committed 9 hours ago
@JANeumatrix
D-100 gap #11: netem placeholder CONFIRMED STANDING until Roosevelt link spec (GA-R5) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-071 point 4 RULED + D-071 ADOPTED closure: all four update-policy points ruled (GA-R5) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-129 sub (iv) RULED: MAAS NTP hierarchy stays -- all four D-129 subs now ruled (GA-R5) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-129 sub (iii) RULED: per-site Tailscale = dedicated node on metal-admin, edge excluded (GA-R5) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-129 sub (ii) RULED: os-frr pinned to Roosevelt design time (GA-R5, utterance quoted) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-129 sub (i) RULED: COS scrapes the edge, in-scope per-DC (GA-R5, utterance quoted) ...
JANeumatrix committed 10 hours ago
@JANeumatrix
D-131 sub-3 RESOLVED (no dhcpd option-6 defect); pin DNS arch review; file D-132 (Roosevelt MAAS topology) ...
JANeumatrix committed 11 hours ago
@JANeumatrix
D-131 sub-2 RULED: forwarder scope = metal-admin only (GA-R5, utterance quoted) ...
JANeumatrix committed 11 hours ago
@JANeumatrix
STAGE 3 CLOSE (operator-ruled): GA-R2 consolidation + skill sweep; gauntlet 76 ALL GREEN ...
JANeumatrix committed 13 hours ago
@JANeumatrix
G16 CLOSED: office1 channels residual reconciled by operator-ruled state surgery; outer plan ZERO DIFF ...
JANeumatrix committed 13 hours ago
@JANeumatrix
Recovery COMPLETE: 9/9 Ready again (shapes exact, power=virsh); retire-fully fully executed; SEC-013 narrowed ...
JANeumatrix committed 13 hours ago
@JANeumatrix
Ruling 1: vr1-dc0-maas RETIRED (repo removed); INCIDENT: pod delete cascaded to 9 machine records ...
JANeumatrix committed 14 hours ago
@JANeumatrix
Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) ...
JANeumatrix committed 14 hours ago
@JANeumatrix
Disconnect collapse: predecessor bookend landed; netem-tc install VERIFIED (step E unblocked) ...
JANeumatrix committed 14 hours ago
@JANeumatrix
Step-E netem sudo: scoped NOPASSWD fragment shipped (operator-ruled) ...
JANeumatrix committed 15 hours ago
@JANeumatrix
Incident docs: 2 appendix-A entries, platform-traps MAC-regen corollary, LP draft ...
JANeumatrix committed 15 hours ago
@JANeumatrix
dc-rack-net installed on the rack: EXIT 0, check 10/10, SOA probe answers ...
JANeumatrix committed 15 hours ago
@JANeumatrix
dc-rack-net.sh: D-131 sub-1 delivery -- rack legs + node-DNS forwarder, repo-carried ...
JANeumatrix committed 15 hours ago
@JANeumatrix
D-131 sub-1 RULED: rack node-DNS forwarder is the STANDING per-DC pattern ...
JANeumatrix committed 16 hours ago
@JANeumatrix
MAC-pin apply executed on voffice1: exact 0/9/0, convergence zero diff ...
JANeumatrix committed 16 hours ago
@JANeumatrix
node-vm: MAAS owns node power -- ignore_changes on running (operator-ruled) ...
JANeumatrix committed 16 hours ago
@JANeumatrix
Session close 2026-07-21: commissioning RESOLVED 9/9 Ready; D-131 proposed; SEC-014 opened ...
JANeumatrix committed 16 hours ago
2026-07-20
@JANeumatrix
Fix committee doc: ASCII byte (em-dash in title) + CURRENT-STATE pointer (L10) ...
JANeumatrix committed 1 day ago
@JANeumatrix
Diagnostic committee (4 reviewers) refutes marginal-timeout 4/4; MTU exonerated by measurement ...
JANeumatrix committed 1 day ago
@JANeumatrix
Clean commissioning experiment: contention refuted; leading hypothesis = marginal 30-min timeout over slow nested I/O ...
JANeumatrix committed 1 day ago
@JANeumatrix
SEC-012 + SEC-013: ledger rows for the two credentials this deploy created (obligation was outstanding) ...
JANeumatrix committed 1 day ago
@JANeumatrix
node-vm console shipped (0/9/0 in-place); commissioning narrowed, UNRESOLVED; two of my own experiments disclosed as INVALID ...
JANeumatrix committed 1 day ago
@JANeumatrix
OPEN: 6/9 nodes fail commissioning; contention refuted; blocked on node-vm having no console ...
JANeumatrix committed 1 day ago
@JANeumatrix
STEP D COMPLETE: per-machine power tooling shipped; commissioning works, nodes reaching Ready ...
JANeumatrix committed 1 day ago