openstack-caracal-dc-dc / opentofu / modules /
..
base-image DC-DC Stage 1 (dc-dc-phase0): first real execution + scaffold/tooling fixes 6 days ago
cloudinit-vm D-119: region-qualify the VR1 DC namespace -- C3 / gap #19 CLOSED (Stage 3 unblocked) 1 day ago
dc-planes DC-DC Stage 1 (dc-dc-phase0): first real execution + scaffold/tooling fixes 6 days ago
dc-storage-pool DC-DC Stage 1 (dc-dc-phase0): first real execution + scaffold/tooling fixes 6 days ago
maas-vm-host Stage-3 review sweep C+D: Model B two-root reshape + SEC-010 hardening 14 hours ago
mesh-link Stage 3 (vr1-dc0) prep batch: D-121..D-124 rulings + substrate/rack wiring, HA overlay, NetBox importers 20 hours ago
netem-link DOCFIX-194: the OpenTofu gate was GREEN over two BROKEN modules 3 days ago
node-vm D-114 follow-through: fix node-vm's nested-virt defect NOW; voffice1 pinned to a reserved address 3 days ago
office1-network DC-DC Stage 1 (dc-dc-phase0): first real execution + scaffold/tooling fixes 6 days ago
opnsense-edge D-113(a2) COMPLETE: DELETE the config.xml path (template, renderer, ISO builder) 3 days ago
site-wan Stage 3 (vr1-dc0) prep batch: D-121..D-124 rulings + substrate/rack wiring, HA overlay, NetBox importers 20 hours ago
wan-bridge D-125: Model B per-DC ISP egress (bridge-in, single-NAT) -- resolves OBS-3 design gap 6 hours ago