History for openstack-caracal-dc-dc / docs
2026-08-02
@JANeumatrix
CORRECTION: the edge break was UFS damage from an unclean power cut, not an update ...
JANeumatrix committed 2 days ago
@JANeumatrix
Close both egress gaps: dc-egress-check.sh + preflight P9, wired into restart + phase-4 ...
JANeumatrix committed 2 days ago
@JANeumatrix
dc0 edge root cause: partially-applied OPNsense update, exposed (not caused) by the reboot ...
JANeumatrix committed 2 days ago
@JANeumatrix
Step 3.5 done; BLOCKER: the dc0 edge has been down since the 08-01 05:48 reboot ...
JANeumatrix committed 2 days ago
@JANeumatrix
D-139 steps 2 and 3 EXECUTED for vr1-dc0: the nodes are on GUA ...
JANeumatrix committed 2 days ago
2026-08-01
@JANeumatrix
GA-R5: VPN (:e0) deferred to Roosevelt design time, recorded not left silent ...
JANeumatrix committed 2 days ago
@JANeumatrix
CURRENT-STATE: record the OOB v4 ruling (d47ef8c landed without this half) ...
JANeumatrix committed 2 days ago
@JANeumatrix
GA-R5: OOB IPv4 allocation ruled -- dc0 10.12.40.0/22, dc1 10.12.88.0/22 ...
JANeumatrix committed 2 days ago
@JANeumatrix
D-139 step 2 (input half): VIP overlay onto GUA; both apex readers learn v6 FAMILY ...
JANeumatrix committed 2 days ago
@JANeumatrix
D-139 step 1 EXECUTED for vr1-dc0: apex GUA carve pushed, 139 -> 152 prefixes ...
JANeumatrix committed 2 days ago
@JANeumatrix
Conformance: dc0 deploy inputs vs the D-139 specs -- the VIP overlay FAILS ...
JANeumatrix committed 2 days ago
@JANeumatrix
GA-R5: D-139 gains an OOB plane, dual-stack; 10.12.60.0/22 ruled back into force ...
JANeumatrix committed 2 days ago
@JANeumatrix
GA-R5 ruling: the D-139 GUA carve is sequenced BEFORE the Stage-5 deploy ...
JANeumatrix committed 2 days ago
@JANeumatrix
L10 correction: cite the preflight capture in CURRENT-STATE (cde7441 pushed lint-red) ...
JANeumatrix committed 2 days ago
@JANeumatrix
Capture: Stage-5 preflight dc0 2026-08-01, post-P8-fix (11 FAIL = the ruled-accepted P5 set) ...
JANeumatrix committed 2 days ago
@JANeumatrix
P8 host guard: && -> || (live false FAIL on voffice1); dc0 MAAS path restored ...
JANeumatrix committed 2 days ago
@JANeumatrix
CORRECTION: no autostart setting was changed, and D-127 already rules it ...
JANeumatrix committed 3 days ago
@JANeumatrix
Both DC VMs 416 -> 480 GiB; 128 GiB swap; new preflight gate P8 (substrate drift) ...
JANeumatrix committed 3 days ago
@JANeumatrix
SESSION CLOSE 2026-08-01 (GA-R4 bookend): snap proxy LIVE, D-139, IPv6 proven ...
JANeumatrix committed 3 days ago
@JANeumatrix
Next steps: nodes released, D-139 execution list replaced, LP draft written ...
JANeumatrix committed 3 days ago
@JANeumatrix
G19 BUILT and PASSED LIVE; finds a latent defect in D-139's execution list ...
JANeumatrix committed 3 days ago
@JANeumatrix
IPv6 PROVEN WORKING on the dc0 node planes -- and already load-bearing ...
JANeumatrix committed 3 days ago
@JANeumatrix
RULED "B plus C": D-139 ruling A narrowed to an experiment + upstream fix ...
JANeumatrix committed 3 days ago
@JANeumatrix
D-139 ruling A NOT achievable at these charm revisions; apex carve tool built ...
JANeumatrix committed 3 days ago
@JANeumatrix
The "juju client blocker" is NOT one -- it is D-138 working correctly ...
JANeumatrix committed 3 days ago
@JANeumatrix
D-139 ruling B RECONSIDERED and CONFIRMED; refuted rationale STRUCK in place ...
JANeumatrix committed 3 days ago
@JANeumatrix
D-139 ruling B's deciding reason REFUTED by measurement; ruling FLAGGED ...
JANeumatrix committed 3 days ago
@JANeumatrix
D-139 ADOPTED: VR1 goes IPv6-only east-west, whole carve moves to GUA ...
JANeumatrix committed 3 days ago
2026-07-31
@JANeumatrix
SESSION CLOSE 2026-07-31 (GA-R4 bookend): Stage 5 dc0 deploy + teardown ...
JANeumatrix committed 3 days ago
@JANeumatrix
Snap proxy tool BUILT and REVIEWED (not yet applied); 4 real bugs logged ...
JANeumatrix committed 3 days ago