openstack-caracal-dc-dc / docs / audit /
..
osd-carve-20260729 LIVE: OSD carve + D-104 controllers complete across both DCs (two agents) 5 days ago
apex-ipv6-plan-20260731.txt D-139 ADOPTED: VR1 goes IPv6-only east-west, whole carve moves to GUA 3 days ago
commissioning-committee-20260720.md Session close 2026-07-21: commissioning RESOLVED 9/9 Ready; D-131 proposed; SEC-014 opened 13 days ago
commissioning-diag-20260721.txt Session close 2026-07-21: commissioning RESOLVED 9/9 Ready; D-131 proposed; SEC-014 opened 13 days ago
committee-20260724-track2-bundle-render.md Stage-5 dc1: committee review + Fork-1 ruling (D-104 amendment) + BUNDLEFIX-052 10 days ago
creds-consolidation-audit-20260727.txt creds consolidation batch: SEC-021(b) dc0 power key, SEC-025 NetBox GUI, V2 ruled deferral 7 days ago
creds-creation-points-20260725.md audit: transcribe the full 55-row credential inventory in-repo (matrix seed) 8 days ago
d125-egress-gate-20260720-matrix.txt D-125 egress isolation gate: PASS / CLOSED -- bridge-in proven end to end (2 identical runs) 14 days ago
d125-egress-gate-20260720.txt D-125 egress gate executed (throwaway VM, as ruled): bridge-in PROVEN, upstream NAT egress fails -- gate OPEN pending one sudo measurement 14 days ago
d125-egress-gate-20260722-dc1.txt G12 dc1: D-125 egress gate PASS (two identical runs, isolation confirmed) 12 days ago
d129-plugins-20260720.txt D-129 edge profile APPLIED on 26.7: qga channel shipped, plugins installed, agent ANSWERS guest-ping 14 days ago
d131-sub3-dhcpd-option6-20260721.txt D-131 sub-3 RESOLVED (no dhcpd option-6 defect); pin DNS arch review; file D-132 (Roosevelt MAAS topology) 13 days ago
d137-location-listing-20260726.txt D-137 committee audit + phase 1: correct the record 8 days ago
d137-tier2-postcommittee-20260726.txt D-137 phase 3: re-measure the register; SEC-024 opened 8 days ago
d137-tier2-privileged-20260726.txt D-137 tier 2: privileged sweep completed; permission gap fixed; 6 inferred filenames corrected 8 days ago
d137-tier2-sweep-20260726.txt D-137 tier 2: live read-only sweep + two probe false-greens it exposed 8 days ago
d137-tier3-probe-20260726.txt D-137 tier 3 behavioural half: V2 declared-state + creds-probe.sh 8 days ago
d137-tier3-provenance-20260726.txt D-137 tier 3 (VALIDITY) BUILT: cross-copy sha256 provenance 8 days ago
d139-carve-dryrun-20260801.txt D-139 ruling A NOT achievable at these charm revisions; apex carve tool built 3 days ago
d139-carve-review-20260801.txt RULED "B plus C": D-139 ruling A narrowed to an experiment + upstream fix 3 days ago
d139-conformance-dc0-20260801.txt Conformance: dc0 deploy inputs vs the D-139 specs -- the VIP overlay FAILS 2 days ago
d139-step1-apex-push-dc0-20260801.txt D-139 step 1 EXECUTED for vr1-dc0: apex GUA carve pushed, 139 -> 152 prefixes 2 days ago
d139-step6-tool-review-20260802.txt D-139 step 6 tool built + adversarially reviewed; 4 defects fixed. Apex NOT yet written. 1 day ago
d139-steps2-3-dc0-20260801.txt D-139 steps 2 and 3 EXECUTED for vr1-dc0: the nodes are on GUA 2 days ago
dc-plane-ipam-baseline-20260727.txt Step 3: dc-plane-ipam.sh check -- D-134's missing executable gate, with a measured baseline 7 days ago
dc-plane-ipam-executed-20260727.txt LIVE: D-134's bands now EXIST -- both DCs at pass=24 fail=0, from a 6/18 baseline 6 days ago
dc-rack-net-install-20260721.txt dc-rack-net installed on the rack: EXIT 0, check 10/10, SOA probe answers 13 days ago
dc0-canary-commission-20260729.txt LIVE: canary re-commission closes R1 precondition 3 by measurement 6 days ago
dc0-dhcp-handover-20260730.txt DHCP handover EXECUTED: dc0 metal-admin now served by the DC-local region 4 days ago
dc0-edge-egress-outage-20260802.txt CORRECTION: the edge break was UFS damage from an unclean power cut, not an update 2 days ago
dc0-edge-rebuild-20260802.txt dc0 edge REBUILT, egress restored (8/8); SEC-032; two dc-egress-check defects fixed 1 day ago
dc0-maas-carve-premigration-20260730.txt Region images synced (jammy+noble); pre-migration carve captured 4 days ago
dc0-node-carve-20260730.txt dc0 v4 node carve COMPLETE: 10/10 machines, gate 134/0, diff vs pre-migration EMPTY 4 days ago
dc0-osd-juju-apply-20260729.txt LIVE: dc0 substrate applied -- R1 OSD volumes + the D-104 controller VM 6 days ago
dc0-premigration-machine-identity-20260730.txt Canary re-enrolment: the ordering a fresh region actually needs 4 days ago
dc0-region-machines-ready-20260730.txt All ten dc0 machines Ready in the per-DC region; task 6 complete 4 days ago
dc0-region-plane-ipam-20260730.txt Plane IPAM complete on the new region: 24/0 PASS, existing tooling only 4 days ago
dc0-region-power-key-20260730.txt Per-region power address, region power-key tool, and two red gates fixed 4 days ago
dc0-region-profile-assert-20260730.txt Region-resolution gate: maas-profile-assert.sh + named dc0 region profile 4 days ago
dc0-region-topology-20260730.txt Session record: dc0 region topology 40/0; cutover blocked with exact commands 4 days ago
dc0-snap-proxy-install-20260731.txt D-139 ADOPTED: VR1 goes IPv6-only east-west, whole carve moves to GUA 3 days ago
dc0-v6-carve-20260727.txt LIVE: dc0 v6 plane carve applied -- 6 MAAS subnets, each read back 6 days ago
dc1-apex-confirm-20260721.txt G12 dc1: apex confirm-free captured; dc-rack-mgmt-import gains per-site (--site) dc1 support 13 days ago
dc1-commissioning-verify-20260723.txt G12 dc1: SEC-016 power key wired + commissioning 9/9 READY -- [V] leg complete 12 days ago
dc1-edge-assessment-20260802.txt dc1 edge: forwards but does not TRANSLATE; config intact; REPAIR not rebuild (SEC-031) 1 day ago
dc1-mirror-teardown-20260727.txt dc1 full mirror REMOVED (D-135 amendment); dc-cache-proxy.sh now owns its net layer 7 days ago
dc1-rack-import-commit-20260722.txt G12 dc1: apex --commit executed + substrate step A applied (5/0/0 exact, converged) 12 days ago
dc1-rack-import-dryrun-20260721.txt G12 dc1: apex confirm-free captured; dc-rack-mgmt-import gains per-site (--site) dc1 support 13 days ago
dc1-rack-import-dryrun-20260722.txt G12 dc1: apex --commit executed + substrate step A applied (5/0/0 exact, converged) 12 days ago
dc1-rack-net-install-20260723.txt G12 dc1: rack-net install + region MAAS config + SEC-016 power-key ruling 12 days ago
dc1-stepB-check-20260722-final.txt G12 dc1 step B COMPLETE: transit live, rack enrolled, SEC-010 both ends, 26.7 staged 12 days ago
dc1-stepB-check-20260722.txt G12 dc1 step B COMPLETE: transit live, rack enrolled, SEC-010 both ends, 26.7 staged 12 days ago
decision-recon-20260725.md D-136 PROPOSED (NetBox-coupled render pipeline) + Ruling 3 + DOCFIX-201 10 days ago
destroy-model-blast-radius-20260802.txt Path M: the juju MODEL teardown + release path, from the runs we already logged 1 day ago
docfix205-d117-annotation-20260730.txt DOCFIX-205 sweep: correct the artifact that filed Q1, and one stale residue 5 days ago
env-snapshot-20260718.md GA-F15: ledger-scan counter self-inflation by audit outputs -- found, reworded, re-verified 16 days ago
g13-close-20260723.txt G13 CLOSED: office1 edge bundle -- qga channel live, 26.7.1, os-iperf in (operator-approved) 11 days ago
g17-dc0-firstboot-20260730.txt G17 dc0 CAPTURED (both assertions PASS); bootstrap root cause = under-carved controller 4 days ago
g19-ipv6-node-plane-verify-20260801.txt G19 BUILT and PASSED LIVE; finds a latent defect in D-139's execution list 3 days ago
g19-ipv6-plane-gate-build-20260801.txt G19 BUILT and PASSED LIVE; finds a latent defect in D-139's execution list 3 days ago
ga-rulings.md Vocabulary RATIFIED: Option A + H1 (utterance quoted) -- PHASE 4 COMPLETE; G2 CLOSED 16 days ago
gai-conf-rfc6724-verification-20260801.txt D-139 ruling B's deciding reason REFUTED by measurement; ruling FLAGGED 3 days ago
gauntlet-20260722-g12-dropstate.txt Session bookend (successor-landed): G12 dc1-authoring session disconnected mid-item-3 13 days ago
gauntlet-20260722-g12-reconcile.txt G12 dc1: item-3 substrate landed + harness reconcile (gauntlet 76 ALL GREEN) 12 days ago
gauntlet-20260723-stage4-dcmirror.txt dc-mirror.sh shipped (D-135 item 1): per-DC apt+UCA mirror, harness 18/18, gauntlet 77 ALL GREEN 11 days ago
grounding-audit-20260718.md Batch 3 CLOSE: memory hygiene (GA-F05..F08 memory surfaces) + G1 review; GA-F16 registered 15 days ago
grounding-audit-charter.md GA: grounding-audit charter + proposed skill additions (freeze in effect; audit session charter) 16 days ago
h1-token-map-20260719.md GA-F10/H1 + GA-R1/R6: token migration, State-line demotions, E1 type tags (2.5+2.6) 15 days ago
incident-20260721-pod-delete-cascade.txt Ruling 1: vr1-dc0-maas RETIRED (repo removed); INCIDENT: pod delete cascaded to 9 machine records 13 days ago
incident-20260721-recovery-verify.txt Recovery COMPLETE: 9/9 Ready again (shapes exact, power=virsh); retire-fully fully executed; SEC-013 narrowed 13 days ago
inner-apply-20260720-stepC-run2.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-apply-20260720-stepC-run3.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-apply-20260720-stepC-run4.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-apply-20260720-stepC.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-apply-20260721-macpin.txt MAC-pin apply executed on voffice1: exact 0/9/0, convergence zero diff 13 days ago
inner-converge-20260720-stepC.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-converge-20260722-dc1-stepC.txt G12 dc1 step C COMPLETE: 28/28 inner resources, 10/10 domains running 12 days ago
inner-plan-20260720-stepC.txt Deploy step C COMPLETE: inner apply 28/28 from voffice1, converged zero diff; 9 nodes + 26.7 edge RUNNING at depth-4; three first-real-apply fixes 14 days ago
inner-plan-20260721-macpin-guarded.txt MAC-pin apply executed on voffice1: exact 0/9/0, convergence zero diff 13 days ago
inner-plan-20260721-macpin.txt node-vm: MAAS owns node power -- ignore_changes on running (operator-ruled) 13 days ago
inner-plan-20260722-dc1-stepC.txt G12 dc1 step C COMPLETE: 28/28 inner resources, 10/10 domains running 12 days ago
lp-draft-20260721-maas-agent-resolver.md Incident docs: 2 appendix-A entries, platform-traps MAC-regen corollary, LP draft 13 days ago
lp-draft-20260801-ceph-osd-ipv6-static.md Next steps: nodes released, D-139 execution list replaced, LP draft written 3 days ago
maas-admin-recovery-20260725.txt SEC-020: MAAS admin-account recovery -- consolidate `admin`, mint `operator`, creds-audit CLEAN x3 9 days ago
maasdb-pgdump-integrity-dc0-20260802.txt Queued-findings backlog: sweep F1 + F6 CLOSED, F2 diagnosed, F3/F4/F5 graduated, DOCFIX-207 1 day ago
mirror-500-timeout-rootcause-20260802.txt sweep F2 ROOT-CAUSED: one bad archive.ubuntu.com backend; "not transient" WITHDRAWN 1 day ago
mirror-exitcode-diagnosis-dc0-20260802.txt Queued-findings backlog: sweep F1 + F6 CLOSED, F2 diagnosed, F3/F4/F5 graduated, DOCFIX-207 1 day ago
mtu-budget-20260727.txt R3 RULED: finish the jumbo underlay; first recorded MTU budget verdict 7 days ago
netem-sudo-install-20260721.txt Disconnect collapse: predecessor bookend landed; netem-tc install VERIFIED (step E unblocked) 13 days ago
node-v6-carve-executed-20260727.txt LIVE: node IPv6 carve both DCs -- 108 links, IPv4 untouched, 18 Ready unchanged 6 days ago
node-v6-carve-scope-20260727.md D-101 governing rationale recorded; node v6 carve scoped; two of my claims corrected 6 days ago
octavia-ipv6-research-20260727.md R8 RULED: Octavia creates and owns its own IPv6 network (D-101 note; sub-ruling closed) 7 days ago
octavia-reissue-executed-20260730.txt F9 CLOSED: controller certs reissued into their own zones, both DCs 4 days ago
operating-model-plan-20260725.md Chat session 10 days ago
outer-apply-20260719-voffice1-transit.txt Step B transit reach ESTABLISHED: voffice1 .1/30 applied (Kea re-key incident fixed); vvr1-dc0 netplan set-name root cause fixed; zero-diff converged 14 days ago
outer-apply-20260719-vvr1dc0-netplan-fix.txt Step B transit reach ESTABLISHED: voffice1 .1/30 applied (Kea re-key incident fixed); vvr1-dc0 netplan set-name root cause fixed; zero-diff converged 14 days ago
outer-apply-20260721-netem.txt Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) 13 days ago
outer-plan-20260718.txt GA Phase 1: deterministic record inventory + measured evidence (freeze upheld) 16 days ago
outer-plan-20260719-baseline.txt D-130 ADOPTED (a) + implemented: seed-volume ignore_changes guard (GA-F01, G4+G5 CLOSED) 15 days ago
outer-plan-20260719-phase6-exit.txt Batch 6: exit runs 1/2/4/5 -- archive exclusion (operator-ruled), adjudication, plan==triple, S2 15 days ago
outer-plan-20260719-postA-converged.txt DC0 deploy STEP A EXECUTED: outer apply 6/0/6 exact; G8+G9 CLOSED; convergence zero 15 days ago
outer-plan-20260719-postG6.txt G6 reconcile EXECUTED (state surgery, operator-ruled) + G7 triple 6/0/6 recorded 15 days ago
outer-plan-20260719-preapply.txt DC0 deploy STEP A EXECUTED: outer apply 6/0/6 exact; G8+G9 CLOSED; convergence zero 15 days ago
outer-plan-20260719-v8-ignorechanges.txt D-130 ADOPTED (a) + implemented: seed-volume ignore_changes guard (GA-F01, G4+G5 CLOSED) 15 days ago
outer-plan-20260719-voffice1-transit.txt Step B prereq: voffice1 transit NIC authored (172.31.0.1/30 region end, D-124); ruling recorded; expected plan 1/1/1 15 days ago
outer-plan-20260719-vvr1dc0-netplan-fix.txt Step B transit reach ESTABLISHED: voffice1 .1/30 applied (Kea re-key incident fixed); vvr1-dc0 netplan set-name root cause fixed; zero-diff converged 14 days ago
outer-plan-20260720-postfix-converged.txt Step B transit reach ESTABLISHED: voffice1 .1/30 applied (Kea re-key incident fixed); vvr1-dc0 netplan set-name root cause fixed; zero-diff converged 14 days ago
outer-plan-20260721-netem-targeted.txt Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) 13 days ago
outer-plan-20260721-netem-wire.txt Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) 13 days ago
outer-plan-20260721-postE-residual.txt Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) 13 days ago
outer-plan-20260721-postG16-converged.txt G16 CLOSED: office1 channels residual reconciled by operator-ruled state surgery; outer plan ZERO DIFF 13 days ago
outer-plan-20260722-dc1-substrate.txt G12 dc1: apex --commit executed + substrate step A applied (5/0/0 exact, converged) 12 days ago
outer-plan-20260722-postdc1-converged.txt G12 dc1: apex --commit executed + substrate step A applied (5/0/0 exact, converged) 12 days ago
outer-plan-20260722-voffice1-dc1nic.txt G12 dc1 step B COMPLETE: transit live, rack enrolled, SEC-010 both ends, 26.7 staged 12 days ago
outer-plan-20260723-office1-qga.txt G13 CLOSED: office1 edge bundle -- qga channel live, 26.7.1, os-iperf in (operator-approved) 11 days ago
outer-plan-20260723-postqga-converged.txt G13 CLOSED: office1 edge bundle -- qga channel live, 26.7.1, os-iperf in (operator-approved) 11 days ago
outer-plan-20260727-stage5-audit.txt Stage-5 grounding audit: live measurement sweep + first five lens returns 7 days ago
phase3-grounding-test-20260718.md GA Phase 3: grounding test PASSED -- 3 probes, 21/21; scorecard + line-neutral amendments 16 days ago
phase5-sweep-plan.md Sweep plan AMENDED per external review (S1-S5, single commit); G3 row updated 16 days ago
phase6-exit-runs-20260719.md AUDIT EXIT: operator re-signed CURRENT-STATE; G3+G11 CLOSED, G9 OPEN; session close (GA-R4) 15 days ago
preflight-20260727-stage5-audit.txt Stage-5 grounding audit: live measurement sweep + first five lens returns 7 days ago
queued-findings-20260726.txt close-out sweep: capture what existed only in the session transcript 7 days ago
queued-findings-20260727-stage5-audit.txt Session-close sweep: three stale surfaces the audit itself created, plus transcript-only facts 7 days ago
queued-findings-20260727.txt close-out durability sweep: 4 transcript-only items landed; dc1-is-not-a-mirror warning 7 days ago
queued-findings-20260729.txt GA-R4 session close: bounded bookend + the 2026-07-29 findings sweep 5 days ago
queued-findings-20260730-dc0-region-migration.txt Close sweep: queued findings F1-F10, memory review, skill invariants 4 days ago
queued-findings-20260730-stage5.txt GA-R4 session close: Stage 5 opened, D-138 + D-132 ruled, dc0 region live 4 days ago
queued-findings-20260730.txt Q2 withdrawn: D-137 fork 1 was ruled 2026-07-25, not open 4 days ago
queued-findings-20260731-stage5-deploy.txt SESSION CLOSE 2026-07-31 (GA-R4 bookend): Stage 5 dc0 deploy + teardown 3 days ago
queued-findings-20260801-stage5-ipv6-d139.txt SESSION CLOSE 2026-08-01 (GA-R4 bookend): snap proxy LIVE, D-139, IPv6 proven 2 days ago
queued-findings-20260802-stage5-edge-fold.txt SESSION CLOSE 2026-08-02 (GA-R4 bookend): dc0 edge rebuilt, D-139 steps 1-3, fold opened 1 day ago
queued-findings-20260802-step6-queued-items.txt SESSION CLOSE 2026-08-02 (part 2, GA-R4 bookend): queued backlog cleared, mirror root-caused, D-139 step 6 EXECUTED 1 day ago
queued-rulings-20260727.md Session-close sweep: three stale surfaces the audit itself created, plus transcript-only facts 7 days ago
r1-precondition3-verify-20260729.txt R1 precondition 3 VERIFIED read-only from voffice1: skip_networking=1 is the control 6 days ago
r6-r15-measurements-20260727.txt Pre-ruling measurements for R6-R15: measure before asking, all ten 7 days ago
r9-r15-final-measurements-20260727.txt Final pre-ruling measurements R9/R10/R12-R15: two premises corrected 7 days ago
record-inventory.md GA Phase 1: deterministic record inventory + measured evidence (freeze upheld) 16 days ago
repo-stage-drift-dc0-20260802.txt Queued-findings backlog: sweep F1 + F6 CLOSED, F2 diagnosed, F3/F4/F5 graduated, DOCFIX-207 1 day ago
sec010-reassert-20260723.txt SEC-010 live re-assert: idempotent nft file on voffice1 + both DC racks (operator-approved) 12 days ago
skill-additions-proposed.md GA: grounding-audit charter + proposed skill additions (freeze in effect; audit session charter) 16 days ago
skill-divergence-20260725.md Chat session 10 days ago
skill-sweep-checklist-20260719.md Batch 5: skill sweep -- GA-R1..R7 implemented in openstack-cloud-ops (single commit) 15 days ago
sprygit-requirements-inputs-20260725.md Chat session 10 days ago
stage4-carve-residue-cleanup-20260727.txt Stage 4 cleanup: carve residue 108 fabrics -> 17; dc1 leftover nginx purged 7 days ago
stage4-carve-verify-20260723.txt Stage 4 carve EXECUTED both DCs: D-133 flat statics + D-134 bands live in MAAS 11 days ago
stage4-discovery-20260723.txt Stage 4 OPEN + D-133 ADOPTED: flat per-NIC carve (VR1), hw-faithful NICs next deployment 11 days ago
stage4-mirror-gate-20260727.txt close-out durability sweep: 4 transcript-only items landed; dc1-is-not-a-mirror warning 7 days ago
stage5-bootstrap-dc0-20260730.txt JUJU CONTROLLER BOOTSTRAPPED: vr1-dc0-controller live, active/idle 4 days ago
stage5-bootstrap-reachability-20260730.txt Stage 5 BLOCKED: no juju-client->node-plane path; D-134 .5 now BUILT both DCs 4 days ago
stage5-committee-raw-20260727.md Stage-5 grounding audit: lens 5 + the three deliverables 7 days ago
stage5-controller-capacity-20260724.txt Stage-5 dc1: committee review + Fork-1 ruling (D-104 amendment) + BUNDLEFIX-052 10 days ago
stage5-controller-rebuild-dc0-20260803.txt dc0 controller REBUILT from MAAS via Path C; environment ready for the deploy 1 day ago
stage5-creds-privileged-20260727.txt Stage-5 grounding audit: lens 4 (gate integrity) + privileged creds re-run 7 days ago
stage5-dc0-bundle-dryrun-20260731.txt Bundle deploy attempt 1 FAILED: prefer-ipv6 unsupported on 6 of 13 VIP charms 4 days ago
stage5-dc0-deploy-attempt1-20260731.txt Bundle deploy attempt 1 FAILED: prefer-ipv6 unsupported on 6 of 13 VIP charms 4 days ago
stage5-dc0-deploy-attempt2-20260731.txt Deploy attempt 2: prefer-ipv6 fixed, two new defects, model partially populated 3 days ago
stage5-dc0-deploy-attempt3-20260731.txt Three post-deploy defects; memcached scaled; ceph-rbd-mirror PINNED (item 22) 3 days ago
stage5-deploy-dc0-20260802.txt STAGE 5 dc0: BUNDLE DEPLOYED, exit 0; Step 4.4 passes and proves the options merge 1 day ago
stage5-dryrun-dc0-20260802.txt DOCFIX-208 part 2: the dry-run graded the gate, and three items could not fail 1 day ago
stage5-expansion-review-20260724.md D-136 PROPOSED (NetBox-coupled render pipeline) + Ruling 3 + DOCFIX-201 10 days ago
stage5-findings-20260729-successor.md Per-DC Octavia PKI generated: independence proven, identity unverified, 12 real findings 5 days ago
stage5-grounding-audit-scope-20260727.md Stage-5 grounding audit: land the scope charter before spawning any agent 7 days ago
stage5-juju-client-blocker-20260801.txt The "juju client blocker" is NOT one -- it is D-138 working correctly 3 days ago
stage5-live-measurement-20260727.txt Stage-5 grounding audit: lens 4 (gate integrity) + privileged creds re-run 7 days ago
stage5-phase0-20260727.txt Phase 0 delivery cleanup: session changelog with reverts, and a mis-filed finding corrected 7 days ago
stage5-prefer-ipv6-charm-research-20260731.txt Sweep both deploy inputs for option NAMES and VALUE TYPES: clean, and proven able to fail 3 days ago
stage5-preflight-dc0-20260730.txt STAGE 5 OPEN: P5 accepted by ruling, entry gate captured on voffice1 4 days ago
stage5-preflight-dc0-20260731.txt Pre-deploy: rack input refreshed + hash-verified, preflight captured, dry-run green 3 days ago
stage5-preflight-dc0-20260801.txt Capture: Stage-5 preflight dc0 2026-08-01, post-P8-fix (11 FAIL = the ruled-accepted P5 set) 2 days ago
stage5-readiness-20260727.md Session-close sweep: three stale surfaces the audit itself created, plus transcript-only facts 7 days ago
stage5-snap-proxy-measurements-20260731.txt Snap proxy tool BUILT and REVIEWED (not yet applied); 4 real bugs logged 3 days ago
stage5-unmeasured-register-20260727.md Second gap sweep: U15-U17 closed; DC data path has no IPv6 at ANY layer 7 days ago
stepB-bootstrap-20260720-run2.txt Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening 14 days ago
stepB-bootstrap-20260720.txt Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening 14 days ago
stepB-check-20260720-final.txt Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening 14 days ago
stepB-check-20260720.txt Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening 14 days ago
stepB-opnsense-prep-20260720.txt Deploy step B COMPLETE: rack bootstrapped + enrolled, SEC-010 CLOSED both ends (operator-ruled), OPNsense 26.7 base staged (operator-ruled); ledger-scan fail-open hardening 14 days ago
stepD-enlistment-20260720.txt INCIDENT RESOLVED + G10 depth-4 boot gate PASS: all 9 DC0 nodes enlisted in MAAS 14 days ago
stepD-power-20260720.txt STEP D COMPLETE: per-machine power tooling shipped; commissioning works, nodes reaching Ready 14 days ago
stepD-vmhost-20260720.txt Pod path chased to root cause: MAAS virsh pods incompatible with node-vm volume-ref disks; per-machine power PROVEN working 14 days ago
stepE-netem-20260721.txt Step E netem DONE -- G10 CLOSED; netem-link local mode; G16 opened (office1 channels residual) 13 days ago
throwaway-v7-20260719.txt D-130 ADOPTED (a) + implemented: seed-volume ignore_changes guard (GA-F01, G4+G5 CLOSED) 15 days ago
uca-origin-asbuilt-comparison-20260802.txt D-135 AMENDMENT 2026-08-02 (b): dc0 converges on the proxy NOW; mirror result is informational only 1 day ago
uca-signing-key-5EDB1B62EC4926EA.asc dc0 deploy blocked: mirrored UCA has no signing key on fresh nodes; root-caused 1 day ago
v6-only-charm-viability-20260801.txt D-139 ruling A NOT achievable at these charm revisions; apex carve tool built 3 days ago
vip-reconciliation-20260727.md VIP/band reconciliation measured; two ruled decisions found to have an unruled gap 7 days ago